The oven and microwave are installed. There's a bit of glare on the appliances from the sun coming in the room.
The cooktop is installed! They finally got the hole big enough to get it in. They have it covered in cardboard with weights on top of it so this is the best shot I could get.
I opened the guest closet and discovered the floor was uncovered there. This is what the entire floor in the great room/dining room/kitchen/foyer looks like.
Here's the carpet as it looks in the spare bedroom.
This is the master bedroom with carpet.
Next week is the refrigerator, the washer/dryer and the shower door. I don't know how much they have left to do after that, but I think we're getting close.